| Applies toManufacturing More Features | AudienceAll users | Last updatedOctober 02, 2025 |
The By-Products feature allows manufacturing users to produce multiple products, including by-products, within a single work order. This improves inventory tracking by recording all produced items in one work order. By-product costs can be calculated using either the Fixed Cost Method or the Allocation Method.
Example Workflow: Peeled Apple Snack Box and By-Products
-
Finished Good: Peeled Apple Snack Box
-
Formula/BOM:
-
1 Apple
-
1 Box
-
1 Plastic Wrap
-
-
-
By-Products: Sold to an Apple Cider Vinegar Company
-
1/4 Ounce Apple Peels
-
1 Apple Core
-
Setting Up By-Products for Finished Goods
-
Create Items for the Finished Good and By-Products:
-
Follow this guide to create finished goods with a formula (BOM).
-
-
Define By-Products for a Finished Good:
-
Open the Item for the finished good.
-
Navigate to the By-Products (Parent Item) related list.
-
Click New.
-
-
In the Item field, enter the by-product.
-
In the Qty Per field, enter how much of the by-product is created when producing one unit of the finished good.
-
Enter the Unit of Measure (UOM) for the by-product.
-
Click Save (or Save & New if adding another by-product).
-
Enable Lot Tracking for By-Products:
-
In the By-Products (Parent Item) list, click the pencil icon next to Lot Tracked.
-
Check Lot Tracked and click Save.
-
-
Note
that the by-product(s) are added to the related list for the finished goods.
Assigning Fixed Costs to By-Products (Optional)
Assign Fixed Costs
-
Open the Item Details Page for the finished good associated with the by-product.
-
Navigate to the By-Products (Parent Item) related list.
-
Click the By-Product record.
-
Click the pencil icon next to Fixed Unit Cost.
-
Enter the fixed cost and click Save.
Note
If you don't see the Fixed Unit Cost field, contact your Salesforce administrator to add it.
Creating a Work Order for Finished Goods and By-Products
Create a Work Order
-
When creating a work order for the finished good, any associated by-products and their quantities will automatically populate.
Processing the Work Order
-
Follow Creating a Work Order and Process Outside Services to process the work order for the finished good and by-products.
-
Review the Output By-Products related list.
Lot Number Management
-
Lot Numbers for by-products are automatically created using the format: YYYYMMDD.
-
If necessary, edit the lot number by navigating to the Output By-Products related list, clicking the OBP number, and selecting a lot or creating a new one.
Cost Allocation Methods for By-Products
1. Fixed Cost Method (Default)
-
By default, GoldFinch uses the Fixed Unit Cost entered on the Output By-Product to cost by-products. The remaining costs are allocated to the finished good.
2. Cost Allocation to Both Output Item and By-Products
-
If the Auto Allocate By-Product Cost checkbox is checked on the Production Journal, costs are allocated based on the total base quantities of the output item and by-products.
Example:
Work Order Total Cost: $201.60
By-Products:
Apple Core: $22.40
Apple Peels: $89.60
Total By-Product Cost: $112.00
Finished Good: $89.60
(Optional) Allocate Total Costs to Both the Output Item and the By-Product
-
Before posting the item journal, click Edit.
-
The Item Journal Details Page is displayed
-
Click the checkbox next to the Auto Allocate By-Product Cost
-
Click Save.
-
Post the Item Journal
-
The Finished Good and By-Product(s) are now in the Output bin.
-
Ledger Entries for By-Products, together with the Output Item, have been created
-
The Is By-Product field will be checked for By-Product output.
-
If the Auto Allocate By-Product Cost field on the Production Journal is not checked, the Fixed By-Product Cost field will be checked on the Item Ledger Entries.
-
Note
If you do not see these columns in the list, please reach out to your Salesforce administrator to add them.
Finish Work Order
When finishing the Work Order, GoldFinch will calculate the By-Product Finished Cost according to the following logic:
Default Option: Fixed By-Product Cost
-
GoldFinch will use the Fixed Unit Cost entered on the Output By-Product to cost By-Product items.
-
The remaining Finished Cost will be allocated to the Output Item using this formula:
-
Cost of Output Item = Finished Cost - By-Product Finished Cost
-
See example below:
Work Order
Finished Cost: 201.60
By-Products:
Apple Core
Qty = 144
Cost = 2.88
Apple Peels
Qty = 36
Cost = 0.36
Total By-Product Cost = 3.24
Output Item: Peeled Apple Snack Box
Qty = 144
Finished Good Cost = 201.60 - 3.24 = 198.36
Alternate Option: Allocate Total Costs to Both the Output Item and the By-Product
-
If the Auto Allocate By-Product Cost is checked on the Production Journal, the Fixed By-Product Cost field will not be checked on the Item Ledger Entries
-
GoldFinch will allocate Finished Cost based on the total base quantities of both the Output Item and the By-Product items using this formula:
-
Cost of By-Product1 = Finished Cost * (Base Quantity of By-Product1 / (Base Quantity of Output Item + Base Quantity of By-Product1 + Base Quantity of By-Product2)
-
-
See example below:
Work Order
Finished Cost: 201.60
By-products:
Apple Core
Qty = 144
Cost = 201.60 * (36/(144+36+144)) = 22.40
Apple Peels
Qty = 36 Ounces
Cost = 201.60 * (144/(144+36+144)) = 89.60
Total By-product Cost = 112.00
Output Item: Peeled Apple Snack Box
Qty = 144
Finished Good Cost = 201.60 - 112.00= 89.60
Cost Updates
-
GoldFinch will update By-Product costs at night using the above logic if the cost of any component is updated.
Article By-Products-from-Work-Orders · Last updated October 02, 2025 · GoldFinch ERP Help Center
Comments
0 comments
Please sign in to leave a comment.