When implementing the Standard Costing Method for your items, it’s important to follow these steps to ensure accurate cost management and system setup:
-
Initialize Standard Base Cost for All Items
-
Use the Import Item Template to import all items and initialize the Standard Base Cost for all items.
-
-
Import Item Formulas
-
Import the Item Formulas for manufactured items or any items requiring a formula.
-
-
Import Item Routings
-
Import the Item Routings for items that involve production processes.
-
-
Verify Key Field Values
-
Before proceeding, ensure that the following fields are set up correctly for each item:
-
Replenishment System:
-
Set to Work Order for items with Item Formulas.
-
Set to Purchase for other purchased items.
-
-
Standard Base Cost:
-
Ensure this is entered for all purchase and service items.
-
-
Inventory Class:
-
Enter Finished Goods, Subassembly, or Raw Materials as applicable.
-
You can also use Finished Goods for service items if needed.
-
-
-
-
Run the Item Calculate Low-Level Code
-
Execute the Item Calculate Low-Level Code to ensure that item structures are calculated correctly for multi-level bills of materials.
-
-
Process the Standard Cost Worksheet for Work Order Items
-
Use the Standard Cost Worksheet to update the standard cost for all Work Order items by rolling up formula and routing costs.
-
-
Import Beginning Inventory
-
Import the Beginning Inventory and compare the inventory value in GoldFinch with the import spreadsheet provided by the client.
-
The value may be slightly different, but it should be close to the original figures.
-
-
-
Import or Enter Opening Transactions
-
Import or manually enter the following open transactions:
-
Sales Orders
-
Purchase Orders
-
Work Orders
-
-
By following these steps, you'll ensure that your items are properly configured with accurate standard costs and that the system is ready for use with consistent and reliable data.